top of page

This highly sensitive project involves the redevelopment of the Crematorium to provide fit for purpose facilities for the bereaved.

Guildford Crematorium Phase 1 is coming to a finish, we have created a mixture of insitu and Precast concrete columns, an insitu Pool and Hard landscaping and soft landscaping works for our client Buxton Building Contractors Limited.


27 views0 comments

Our site down in Bath receiving tarmac on the main access road.



21 views0 comments

Client: Dandara Group

Sector: Residential

Duration: 52 wks

Value: £2.65M

LF were contracted to complete the full site remediation and cut and fill works. This project was met with its own problems in that a material management plan was needed to deal with asbestos fibres, which were discovered scattered across the site following demolition works. Following the remediation and cut / fill works, the project became a traditional residential development site. Numerous retaining walls were required due to a steep sloping site. A sustainable drainage system was adopted to deal with the surface water with roads and driveways constructed using a Bodpave product. LF were responsible for completing each plot up to DPC level inclusive of traditional foundations, sub-structure blockwork, plot drainage and services, beam and block flooring and powerfloated oversites, together with gas membranes to all dwellings.

Specialist Works: Working with contaminated material


38 views0 comments