top of page

Progress down at Langley Grammar School

  • Sammy
  • Jun 4, 2019
  • 1 min read

LFS showing the ground floor slab at Langley Grammar School prepared ready to take the concrete. Alongside picture of the works installing the 1st of 3 SDS soakaways.





Commentaires


CONTACT US

6 Water End Barns

New Water End 

Eversholt

Bedfordshire

MK17 9EA

 

Tel: 0845 299 3512 or 01582 883965    

info@lfsolutionsltd.com

Name *

Email *

Subject

Message

Success! Message received.

  • Black Facebook Icon
  • Black Twitter Icon
bottom of page